re: Buc-ee’s timeline altered due to DOTD studies

Posted on 3/16/23 at 8:35 am to
Posted by Ingeniero
Baton Rouge
Member since Dec 2013
19048 posts
Posted on 3/16/23 at 8:35 am to
quote:

Somebody please explain to me like I'm 5 what the hell could take 6 months to complete a study.


They don't, which is why I'm curious exactly what the mayor is citing. I can imagine something like Buc-ee's will get priority in review, and rightly so. The study and review shouldn't take long, but the construction to the interchange probably will.

ETA and like jester said the developer provides the study, i don't think DOTD does anything except approve the results
This post was edited on 3/16/23 at 8:37 am
Posted by RealityTiger
Geismar, LA
Member since Jan 2010
20467 posts
Posted on 3/16/23 at 8:44 am to
Oh yes indeed the construction to the interchange will take that long. DOTD loves to go with the cheapo bargain basement contractor bid with a company that has ten employees, a rusty pickup truck, and a credit card to rent equipment. They take FOREVER to get road projects done in this state.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram