Started By
Message

re: Final three routes for new bridge released.

Posted on 5/27/22 at 9:39 am to
Posted by LNCHBOX
70448
Member since Jun 2009
84373 posts
Posted on 5/27/22 at 9:39 am to
quote:

And if it doesnt include a connector to 10 west of lobdell it wont help much


That undoubtedly is being planned as well. but there aren't many "easy" paths.
Posted by Slippy
Across the rivah
Member since Aug 2005
6606 posts
Posted on 5/27/22 at 9:44 am to
quote:

That undoubtedly is being planned as well. but there aren't many "easy" paths.


The problem is money. The amount of money it would take to build an elevated expressway through a protected wetland would be off the charts. Yes, there are route options. We may see the bridge built in our lifetimes, but not the connector. We may all be driving flying cars before then.
Posted by member12
Bob's Country Bunker
Member since May 2008
32127 posts
Posted on 5/27/22 at 11:25 am to
quote:

That undoubtedly is being planned as well. but there aren't many "easy" paths.



West side connector will be a lot easier than the east side.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram