DOTD waits till the first week of school to start bridge inspections

Posted on 8/3/26 at 3:28 pm
Posted by nicholastiger
Member since Jan 2004
56971 posts
Posted on 8/3/26 at 3:28 pm
The Louisiana Department of Transportation and Development is conducting inspections on the Mississippi River Bridge in East Baton Rouge Parish starting Monday.

Inspections on the I-10 bridge will test whether the bridge remains structurally sound to carry 100,000 vehicles worth of traffic daily.

DOTD inspects the bridge every two years, with crews typically inspecting the bridge using underbridge inspection trucks and man-lifts. This requires multiple lane closures, DOTD officials said. In order to cause minimal impact on traffic, crews will be utilizing a rope access method to access most parts of the bridge.

Brief rolling closures will happen between 6 a.m. and 3 p.m. between Monday, Aug. 3, and Sunday, Aug. 16.
Posted by fightin tigers
Downtown Prairieville
Member since Mar 2008
79544 posts
Posted on 8/3/26 at 3:41 pm to
They really should plan around your schedule
Posted by Maillard
BTR
Member since Jul 2021
423 posts
Posted on 8/3/26 at 3:41 pm to
I would say I don't believe you. Then I think about our lovely dotd. They're not the sharpest tool in the shed as a collective. Not only do they do this when school starts but in the hottest part of the year inspecting metal and concrete.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram