quote:

common construction discussions, we use the terms "drilled" and "driven" all the time.


Well aware, it's how I earn a living.

quote:

everyone knows what you mean when you're talking with engineers and on the job site. And no one gets in a pissin contest over what we're gonna call the deep arse hole with rebar and concrete in it.


Piles and shafts are very different in how they are constructed. A deep arse hole that you fill with rebar and concrete is a drilled shaft and not a pile. If you mix those up it could be a huge frick up.

This ain't close to being pissy, this is trying to make heads or tails of what dude was talking about.
Posted by Duckhammer_77
TD Platinum member
Member since Nov 2016
2713 posts
Posted on 5/8/18 at 12:56 pm to
I'll just finish my Jimmy Johns and let yall have this one....need to prep an RFI about a pile drillin' rig being too close to an erosion control fence.
This post was edited on 5/8/18 at 4:43 pm
Posted by BoostAddict
Member since Jun 2007
2995 posts
Posted on 5/8/18 at 1:15 pm to
quote:

Piles and shafts are very different in how they are constructed. A deep arse hole that you fill with rebar and concrete is a drilled shaft and not a pile. If you mix those up it could be a huge frick up.

This ain't close to being pissy, this is trying to make heads or tails of what dude was talking about.


you sound just out of school... and full of shite.

Engineers call drilled shafts and auger cast PILES "piles" all of the time.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram