- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: Will I-49 south ever get built?
Posted on 8/28/15 at 10:08 am to MrLSU
Posted on 8/28/15 at 10:08 am to MrLSU
quote:just like with the BR loop, it's the citizens that slow, pause, or altogether stop a big project like this, not the big bad stupid government.
The LA DOTD and Corps of Engineers at their finest level of incompetence with this project too.
from the metropolitan planning website:
quote:
In 1987, the U.S. Congress authorized and funded a demonstration study to provide limited continuous access between an interstate route and a highway on the Federal-Aid primary system in Lafayette, Louisiana. Since 1987, several studies were concluded with a route being chosen by the local governing council, Alternative RR-4, which utilizes the current Evangeline Thruway alignment between I-10 and U.S. 90 (Cameron St), utilizes a new alignment curving near the Union Pacific Railroad between U.S. 90 and Pinhook Road, and returns to the existing Thruway alignment north of Pinhook Road. Public debate was intense and prompted a lawsuit to stop the RR-4 alignment from being built. Continued public meetings, education, and participation produced the Blue Book prepared by ULL's Community Design Workshop. The Blue Book along with postive public participation allowed LCG to overcome the lawsuit, continue work on the I-49 Connector, and create an agreement with all government parties involved that would become a document known as the Corridor Preservation and Management Action Plan to Preserve the I-49 Alignment (Action Plan). Currently, staff is executing the Action Plan and continuing work to advance the I-49 Connector project.
LINK
Popular
Back to top
Follow TigerDroppings for LSU Football News