Started By
Message

re: Superdome Renovation

Posted on 2/10/10 at 4:31 pm to
Posted by jplaf
Metairie,LA
Member since Aug 2004
41 posts
Posted on 2/10/10 at 4:31 pm to
As stated earlier they are widening the plaza level concourse areas, removing the moving seats in the plaza and replacing them with new ones. They are building out the area under the plaza seats and calling it the bunker club. They are also moving the press box area to the top of the terrace. The area that was the press box will be built out with new suites. They are updating the aduio capabalities of the facility. They are also moving the Saints locker room making them bigger and more up to date. The bunker club area will also have a direct entrance in from the parking lot. The original budget was 85 million the winning bid came in around 36 mil. However the bid was thrown out and it will be rebid in about a month.
This post was edited on 2/10/10 at 4:32 pm
Posted by nino2469
Baton Rouge, LA
Member since Sep 2004
5526 posts
Posted on 2/10/10 at 4:33 pm to
we need better video screens, ours suck
Posted by Seven Constanza
Brooklyn
Member since Sep 2009
799 posts
Posted on 2/10/10 at 4:33 pm to
They are also bringing in whores from Vegas to replace the Saintsations.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram