- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: Wind Power Production Drops Despite 6.2GW of Added Capacity
Posted on 5/1/24 at 5:59 pm to PikesPeak
Posted on 5/1/24 at 5:59 pm to PikesPeak
quote:
If utilities had substations sized more capably, more modern transmission lines with less losses, more integrated storage systems, they could take in more generation and distribute, causing less stress on the systems, removing the need for a rolling blackout.
This is basically what VPP is trying to accomplish.
Popular
Back to top
Follow TigerDroppings for LSU Football News