- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: are pumps working in Lakeview ?
Posted on 3/4/24 at 5:09 pm to LivingstonLaw
Posted on 3/4/24 at 5:09 pm to LivingstonLaw
Posted on 3/4/24 at 5:09 pm to tgrbaitn08
Equipment Status as of March 4, 2024
Major Drainage Pumps: 93 of 99 Major Drainage Pumps Available For Use
Details of pump status:
DPS 3 on Florida Ave near Hwy 90: D Pump out of service due to replacement of bearing housing unit.
4 additional drainage pumps available at this station + 4 constant duty pumps
DPS 10 at Haynes Blvd. and Shubrick Ave. at Citrus Canal: No. 1 Pump out of service
3 additional drainage pumps available at this station
DPS 13 near Tall Timbers Algiers: No. 4 Pump on standby for emergency use only.
5 additional drainage pumps available at this station + one constant duty pump
DPS 15 near Intracoastal Waterway and Industrial Pkwy: No. 1 Pump out of service.
2 additional drainage pumps available at this station
DPS 17 near Florida Ave. and Peoples: Pumps A & D out of service due to issues with the electric motor.
Underpass Stations:
All underpass pumps in service.
Click here for an overview and an interactive map of our drainage system.
Power:
Turbine 4 unavailable.
Turbine 5 online.
Turbine 6 online.
EMDs #3, #4 and #5 are in service. EMD #1 is offline due to a radiator leak, #2 due to electrical issues.
Frequency Changer #1 at Carrollton Frequency Changer Facility available for use
Frequency Changer #2 at Carrollton Water Treatment Plant available for use
Frequency Changer #3 at Station D available for use
Frequency Changer #4 at Station D out of service due to electrical issues
Plant Frequency Changer at Carrollton Water Plant out of use due to an electrical issue
Frequency Changer #3 at Algiers Water Treatment Facility available for use
This page was last modified on Mar 4, 2024 2:11 PM
Major Drainage Pumps: 93 of 99 Major Drainage Pumps Available For Use
Details of pump status:
DPS 3 on Florida Ave near Hwy 90: D Pump out of service due to replacement of bearing housing unit.
4 additional drainage pumps available at this station + 4 constant duty pumps
DPS 10 at Haynes Blvd. and Shubrick Ave. at Citrus Canal: No. 1 Pump out of service
3 additional drainage pumps available at this station
DPS 13 near Tall Timbers Algiers: No. 4 Pump on standby for emergency use only.
5 additional drainage pumps available at this station + one constant duty pump
DPS 15 near Intracoastal Waterway and Industrial Pkwy: No. 1 Pump out of service.
2 additional drainage pumps available at this station
DPS 17 near Florida Ave. and Peoples: Pumps A & D out of service due to issues with the electric motor.
Underpass Stations:
All underpass pumps in service.
Click here for an overview and an interactive map of our drainage system.
Power:
Turbine 4 unavailable.
Turbine 5 online.
Turbine 6 online.
EMDs #3, #4 and #5 are in service. EMD #1 is offline due to a radiator leak, #2 due to electrical issues.
Frequency Changer #1 at Carrollton Frequency Changer Facility available for use
Frequency Changer #2 at Carrollton Water Treatment Plant available for use
Frequency Changer #3 at Station D available for use
Frequency Changer #4 at Station D out of service due to electrical issues
Plant Frequency Changer at Carrollton Water Plant out of use due to an electrical issue
Frequency Changer #3 at Algiers Water Treatment Facility available for use
This page was last modified on Mar 4, 2024 2:11 PM
Popular
Back to top
![logo](https://images.tigerdroppings.com/images/layout/TDIcon.jpg)