- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: Pouring Concrete
Posted on 8/10/12 at 9:22 pm to mandevilletiger34
Posted on 8/10/12 at 9:22 pm to mandevilletiger34
No post-tension?
Posted on 8/10/12 at 9:48 pm to 4LSU2
quote:
He's doing a patio, not a fricking foundation for a multi story building.
Posted on 8/10/12 at 10:08 pm to TexTiga
How far down are you gonna drive the piles to hold up the roof?
Posted on 8/10/12 at 10:24 pm to Chad504boy
You could always go Corps specs 100% Modified compaction
Posted on 8/10/12 at 10:59 pm to sigsauer
Dudes this turned out WAY better than I expected
:rotflmao:
I had the dude go ahead and scrape the grass off and cover with a couple inches of sand. Now he will pour a 16" slab with 36" footers so my BBQ pit will not shift when I put an 8 lb brisket on it.
Awesome knowledge here on TD
:rotflmao:
I had the dude go ahead and scrape the grass off and cover with a couple inches of sand. Now he will pour a 16" slab with 36" footers so my BBQ pit will not shift when I put an 8 lb brisket on it.
Awesome knowledge here on TD
Posted on 8/11/12 at 9:08 am to TexTiga
I am coming over for my first inspection today. What did you spec out for the chairs?
Posted on 8/11/12 at 10:18 am to sfurnish
Dont forget to wet cure the concrete with burlap for 5 days. And saw cut joints every 20 ft no longer than 12 hours after concrete is placed.
Posted on 8/11/12 at 10:20 am to Motorboat
And im an QC inspector on the I-10 widening project.
Posted on 8/11/12 at 10:22 am to sfurnish
quote:
What did you spec out for the chairs?
3" continous high chairs
Posted on 8/11/12 at 10:33 am to Elusiveporpi
quote:
Dont forget to wet cure the concrete with burlap for 5 days. And saw cut joints every 20 ft no longer than 12 hours after concrete is placed.
ACI now recommends 13' max spacing on joints. Doing it in the middle of summer it's gonna crack up real good without that burlap.
And this thread is gold.