| Posted by | Message |
bbap  Indiana Fan Baton Rouge, LA Member since Feb 2006 71802 posts

| re: North Endzone refurb (Posted on 11/29/12 at 3:23 pm to Y.A. Tittle)
its cool.
|
| Back to top | |
swamie  Memphis Fan Brewers Fan Member since Jan 2007 19603 posts
Online

| re: North Endzone refurb (Posted on 11/29/12 at 3:24 pm to Y.A. Tittle)
nap loves him some construction threads huh?
|
| Back to top | |
Tigerfan7218  LSU Fan Baton Rouge Member since Nov 2010 7160 posts

| re: North Endzone refurb (Posted on 11/29/12 at 3:24 pm to bbap)
I'll be interested to see how that turns out, I mean they have a HUGE chunk fenced off. Basically from the pay spots in front of the Athletic Building to half the lot in from of the journalism pavillion and out as far as half the lane of North Stadium closer to TS. They were tearing up sidewalk this morning, didn't notice them doing anything this afternoon though
|
| Back to top | |
bbap  Indiana Fan Baton Rouge, LA Member since Feb 2006 71802 posts

| re: North Endzone refurb (Posted on 11/29/12 at 3:24 pm to swamie)
i own all the sim cities.
|
| Back to top | |
bbap  Indiana Fan Baton Rouge, LA Member since Feb 2006 71802 posts

| re: North Endzone refurb (Posted on 11/29/12 at 3:25 pm to Tigerfan7218)
ill be getting a look tonight on my way to the game.
|
| Back to top | |
Tigerfan7218  LSU Fan Baton Rouge Member since Nov 2010 7160 posts

| re: North Endzone refurb (Posted on 11/29/12 at 3:26 pm to bbap)
The only really noticeable thing is that all the crappy chainlink in front of the lawton room and the student entrance is gone
|
| Back to top | |
Golfer  LSU Fan Coral Bay, St. John, USVI Member since Nov 2005 47557 posts

| re: North Endzone refurb (Posted on 11/29/12 at 3:31 pm to Tigerfan7218)
quote:
The only really noticeable thing is that all the crappy chainlink in front of the lawton room and the student entrance is gone
Based on the renderings from the 2009 Strategic plan, it looks like they will be re-doing the sidewalks, gates, and lighting on the ground.
|
| Back to top | |
TigersOfGeauxld  LSU Fan Across the burning sands... Member since Aug 2009 14966 posts

| re: North Endzone refurb (Posted on 12/1/12 at 12:12 pm to Golfer)
quote:
Based on the renderings from the 2009 Strategic plan, it looks like they will be re-doing the sidewalks, gates, and lighting on the ground.
Yup. And work on the NEZ will likely be started sometime in 2016 or 2017. Alleva has stated he wants time for all the suites in the SEZ expansion to sell and the demand for new suites to build to the point where it becomes certain that there will be no problems selling out the NEZ suites. That's not currently the case. This is all about maximizing LSU's ROI. And TIFWIW, but don't expect the NEZ expansion to look exactly like the SEZ expansion. The SEZ expansion was about covering up an eyesore. The NEZ expansion will be about showcasing what is right about TS. 
This post was edited on 12/1 at 1:07 pm
|
| Back to top | |
Adam4LSU  LSU Fan Baton Rouge Member since Mar 2008 6253 posts

| re: North Endzone refurb (Posted on 12/1/12 at 12:23 pm to Geauxld Finger)
quote:
the north end will never be expanded. there isn't enough room for traffic. it would create too big of a pinch point on campus on game days and encroach on mike's habitat.
retard
|
| Back to top | |
bbap  Indiana Fan Baton Rouge, LA Member since Feb 2006 71802 posts

| re: North Endzone refurb (Posted on 12/1/12 at 12:53 pm to TigersOfGeauxld)
That didn't answer my question. I was asking about the refurb, not expansion.
|
| Back to top | |
Malaysian Tiger  LSU Fan Asia Member since May 2008 1147 posts

| re: North Endzone refurb (Posted on 12/1/12 at 12:54 pm to Adam4LSU)
LINK Go here
|
| Back to top | |
TigersOfGeauxld  LSU Fan Across the burning sands... Member since Aug 2009 14966 posts

| re: North Endzone refurb (Posted on 12/1/12 at 12:57 pm to bbap)
quote:
That didn't answer my question. I was asking about the refurb, not expansion
quote:
Construction on the North Plaza area will begin following the 2012 football season.
About the West & North Stadium Plazas Project
|
| Back to top | |
bbap  Indiana Fan Baton Rouge, LA Member since Feb 2006 71802 posts

|
Yeah thanks.
|
| Back to top | |
GreatLakesTiger24  LSU Fan ignore username, i hate the north Member since May 2012 6932 posts

| re: North Endzone refurb (Posted on 12/1/12 at 1:06 pm to bbap)
student section is north, right?
|
| Back to top | |
TigersOfGeauxld  LSU Fan Across the burning sands... Member since Aug 2009 14966 posts

|
quote:
student section is north, right?
Mostly yes. Section 7 on that chart. 
|
| Back to top | |
junkfunky  LSU Fan I can't find my village Member since Jan 2011 9833 posts

| re: North Endzone refurb (Posted on 12/1/12 at 2:44 pm to bbap)
I think the plan is to have it done by bcsf. I'm not sure if they are gonna wait until they finish the north side to start working on the champion's walk or not but it shouldn't be an issue.
|
| Back to top | |
junkfunky  LSU Fan I can't find my village Member since Jan 2011 9833 posts

| re: North Endzone refurb (Posted on 12/1/12 at 2:48 pm to bbap)
quote:
Also i thought at one point they actually wanted to close off north stadium drive and have the courtyard area extend basically to the pmac but they may have decided against that
That could have possibly been discussed but that's not planned for this project and couldn't be an option until s. stadium opens back up in 2014.
|
| Back to top | |