How pathetic has the construction progress on Napoleon been?

Posted on 8/29/14 at 9:00 am
Posted by HeadyBrosevelt
the Verde River
Member since Jan 2013
21590 posts
Posted on 8/29/14 at 9:00 am
I thought this shite was going to be wrapped up in time for the Super Bowl. That was two years ago. What the frick is going on?
Posted by The Third Leg
Idiot Out Wandering Around
Member since May 2014
10046 posts
Posted on 8/29/14 at 9:01 am to
You should see how they do it in Texas; road construction projects never end, they just expand.
Posted by ell_13
Member since Apr 2013
85033 posts
Posted on 8/29/14 at 9:01 am to
quote:

That was two years ago. What the frick is going on?
Government contract work
Posted by Swagga
504
Member since Dec 2009
16143 posts
Posted on 8/29/14 at 9:02 am to
That's bad, and jefferson looks like it could be equally as bad.
Posted by BugAC
St. George
Member since Oct 2007
52787 posts
Posted on 8/29/14 at 9:07 am to
quote:

I thought this shite was going to be wrapped up in time for the Super Bowl. That was two years ago. What the frick is going on?


THat "project" is actually multiple individual projects. Spanning different lengths. I assume you are talking about the box culvert work underneath the roadway. It's a lot more difficult than just roadwork. They are ripping up and rebuilding the water and sewer lines that have been there since the 30's. Lots of unknowns in that area too, due to lost plans from many years ago.
Posted by Mouth
Member since Jan 2008
20969 posts
Posted on 8/29/14 at 9:10 am to
2017 Heady. I'm not joking.
Posted by Forkbeard3777
Chicago
Member since Apr 2013
3841 posts
Posted on 8/29/14 at 9:11 am to
quote:


THat "project" is actually multiple individual projects. Spanning different lengths. I assume you are talking about the box culvert work underneath the roadway. It's a lot more difficult than just roadwork. They are ripping up and rebuilding the water and sewer lines that have been there since the 30's. Lots of unknowns in that area too, due to lost plans from many years ago.


New Orleans isn't the only town that deals with these very same obstacles. The project would be completed elsewhere in less than a year. New Orleans works on a different clock.
Posted by lighter345
Member since Jan 2009
11864 posts
Posted on 8/29/14 at 9:11 am to
Posted by lighter345
Member since Jan 2009
11864 posts
Posted on 8/29/14 at 9:13 am to
Bunch of construction company owners up in here.
Posted by Neauxla
New Orleans
Member since Feb 2008
33443 posts
Posted on 8/29/14 at 9:14 am to
It is pretty pathetic.
Posted by Rickety Cricket
Premium Member
Member since Aug 2007
46883 posts
Posted on 8/29/14 at 9:16 am to
Must have given the contract to a Baton Rouge contractor.
Posted by GEAUXT
Member since Nov 2007
29241 posts
Posted on 8/29/14 at 9:16 am to
quote:

construction progress on Napoleon been?


what progress?
Posted by WhoDatNC
NC
Member since Dec 2013
11705 posts
Posted on 8/29/14 at 9:19 am to
Paid by the hour....
Posted by Napoleon
Kenna
Member since Dec 2007
69078 posts
Posted on 8/29/14 at 9:23 am to
it has been soo slow. Claibourne crawls along too. I get that both are getting new canals put in under the neutral ground, but still very slow.

Also they are tearing up the middle of streets and changing the draining then patching with black top. If you want to see the after effects of that, take a drive into the 9th ward.
Posted by Puck82
Baton Rouge
Member since Mar 2009
23648 posts
Posted on 8/29/14 at 9:24 am to
quote:

New Orleans isn't the only town that deals with these very same obstacles. The project would be completed elsewhere in less than a year. New Orleans works on a different clock.


Evidently you don't know shite about construction. A fricking year.
Posted by Napoleon
Kenna
Member since Dec 2007
69078 posts
Posted on 8/29/14 at 9:32 am to
I've seen long stretches of Interstate and tollways go up in a year or two in Texas, and seen lane widening take four-six years here.
Posted by HeadyBrosevelt
the Verde River
Member since Jan 2013
21590 posts
Posted on 8/29/14 at 9:34 am to
quote:

Evidently you don't know shite about construction


I don't and never claimed to.
Posted by Puck82
Baton Rouge
Member since Mar 2009
23648 posts
Posted on 8/29/14 at 9:36 am to
Wide arse open interstate construction is a completely different animal from working in tight quarters like Napoleon. Not to mention having to deal with the residents.

Posted by TigerWise
Front Seat of an Uber
Member since Sep 2010
35113 posts
Posted on 8/29/14 at 9:36 am to
It's a huge pain in my arse. Now they got down to the front of Mae's and is screwing with my vibes brah.
Posted by HeadyBrosevelt
the Verde River
Member since Jan 2013
21590 posts
Posted on 8/29/14 at 9:37 am to
quote:

It's a huge pain in my arse. Now they got down to the front of Mae's and is screwing with my vibes brah.


Are you playing in the big Labor Day TWAT at Mae's?
first pageprev pagePage 1 of 3Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram