Mudminnow LSU Fan Member since Aug 2004 27921 posts
re: Any updates on construction at Tiger Stadium? (Posted on 1/15/13 at 11:02 am to Spelt it rong)
I don't have any pictures but I've been impressed with this group so far. They've been working 7 days a week, 12+ hrs per day even in all this nasty weather. In the past it appeared to me the crews always took their sweet time but I've been impressed so far.
junkfunky LSU Fan I can't find my village Member since Jan 2011 10135 posts
re: Any updates on construction at Tiger Stadium? (Posted on 1/15/13 at 2:46 pm to Spelt it rong)
Job sites area mess. North stadium work is on hold, but the demo is completed. Not a lot of activity on the South side, just saw a couple of guys walking around aimlessly. Piling rig is set up so I assume they aren't done with all of it but I wouldn't think that they can move the rig a lot in the current site conditions.