Started By
Message

re: Pouring a concrete slab for a portable building myself?

Posted on 8/6/13 at 3:55 pm to
Posted by Creamer
louisiana
Member since Jul 2010
2817 posts
Posted on 8/6/13 at 3:55 pm to
I don't need it, but OP this is what you need for the slab.
Posted by eng08
Member since Jan 2013
5997 posts
Posted on 8/6/13 at 4:52 pm to
Do it at night bc this heat might crack it if it gets too hot.

Make sure you have a set retarder with this heat right now as well.

Try to make sure it doesn't slump too much (less than 6" is good). If its too thin of a mix it will probably crack later on. Having a lesser slump will make it more difficult to work with but strength will be much better.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram