Relief? Work on Terrace Ave "left exit" on I-10 in Baton Rouge to begin in Spring

Posted on 8/15/17 at 3:11 pm
Posted by goofball
Member since Mar 2015
16859 posts
Posted on 8/15/17 at 3:11 pm
quote:

Work on Terrace Avenue exit ramp off I-110 should begin in spring

LINK

Design work on a new Interstate 110 exit ramp at Terrace Avenue is about “95 percent” complete and construction on the project should start in the spring.

Anna Hanks, a project manager for the Louisiana Department of Transportation, told Downtown Development District commissioners at their monthly meeting Tuesday that construction of the exit ramp will take 18 to 24 months, meaning that it should be finished by spring 2020. The work is expected to cost $20 million.


This should actually help right? It isn't going to change the fact that I-10 narrows to one single lane, but it at least should reduce the chances of motorists having to cut across that one lane.
Posted by tke857
Member since Jan 2012
12195 posts
Posted on 8/15/17 at 3:12 pm to
Posted by Trout Bandit
Baton Rouge, LA
Member since Dec 2012
13245 posts
Posted on 8/15/17 at 3:12 pm to
They might be able to shutdown the Washington St exit and make it 2 lanes coming off the bridge.
Posted by Cosmo
glassman's guest house
Member since Oct 2003
120257 posts
Posted on 8/15/17 at 3:13 pm to
quote:

should be finished by spring 2020


So Fall 2021
Posted by LSU2NO
Baton Rouge
Member since Oct 2007
1923 posts
Posted on 8/15/17 at 3:14 pm to
What that means is that when the left exit is finished the Washington St. exit can be closed and I-10 finally can be two lanes. Traffic flow should be better.
This post was edited on 8/15/17 at 3:15 pm
Posted by tigerbutt
Deep South
Member since Jun 2006
24576 posts
Posted on 8/15/17 at 3:14 pm to
It'll never be ready in time.....oh it'll never get done.
Posted by Cosmo
glassman's guest house
Member since Oct 2003
120257 posts
Posted on 8/15/17 at 3:15 pm to
quote:

I-10 finally can be two lanes.


No it cant. Unless you are gonna drop 110 to 1
Posted by Tigeralum2008
Yankees Fan
Member since Apr 2012
17131 posts
Posted on 8/15/17 at 3:17 pm to
quote:

The work will not impact the Washington Street exit; there had been some discussion about relocating it to alleviate traffic backups. “This is an extra left exit,” she said.


Posted by lnomm34
Louisiana
Member since Oct 2009
12609 posts
Posted on 8/15/17 at 3:24 pm to
That ought to be a clusterfrick.

Posted by DustyDinkleman
Here
Member since Feb 2012
18176 posts
Posted on 8/15/17 at 3:25 pm to
I've never understood why they needed a Washington Street Exit when you can just take Dalrymple and connect. That intersection and the one lane onto 10 screws traffic patterns up so bad off that bridge.
Posted by member12
Bob's Country Bunker
Member since May 2008
32095 posts
Posted on 8/15/17 at 3:26 pm to
quote:

That ought to be a clusterfrick.



Sounds like they want to fit it in the gap between the spans.

It would help, but it won't replace the need to widen I-10 between that point to the 10/12 split. It will also help justify the eventual closure of the Washington Street exit.
Posted by Boudreaux35
BR
Member since Sep 2007
21449 posts
Posted on 8/15/17 at 3:28 pm to
This is SUPPOSED to be a "relief" effort, not a full blown solution. The problem is that the solution must include the removal of the existing Wash. St exit and their is a group of idiots in this town who claim that the removal of that exit is racially motivated.

Until society stops bowing to stupid people, it will continue to get worse.
Posted by upgrayedd
Lifting at Tobin's house
Member since Mar 2013
134860 posts
Posted on 8/15/17 at 3:35 pm to
quote:

that construction of the exit ramp will take 18 to 24 months

Only in this fricked up state could an exit ramp take 2 years to build
Posted by lnomm34
Louisiana
Member since Oct 2009
12609 posts
Posted on 8/15/17 at 3:36 pm to
Two years and $20 million.
Posted by upgrayedd
Lifting at Tobin's house
Member since Mar 2013
134860 posts
Posted on 8/15/17 at 3:37 pm to
quote:

What that means is that when the left exit is finished the Washington St. exit can be closed and I-10 finally can be two lanes. Traffic flow should be better.

Not really. The Wash exit needs to be destroyed and an elevated lane put in it's place.
Posted by TigerstuckinMS
Member since Nov 2005
33687 posts
Posted on 8/15/17 at 4:11 pm to
quote:

Work on Terrace Avenue exit ramp off I-110 should begin in spring

Why do we need a convenient way to leave the interstate and enter the hood?
Posted by TaderSalad
mudbug territory
Member since Jul 2014
24653 posts
Posted on 8/15/17 at 4:27 pm to
quote:

Relief? Work on Terrace Ave "left exit" on I-10 in Baton Rouge to begin in Spring



is this the loop or nah?
Posted by #1TigerFan
Member since Apr 2005
1665 posts
Posted on 8/15/17 at 4:32 pm to
This is 20 million being wasted for purely political purposes. The residents in that area can use the Nicholson Exit coming from the bridge, Government St. southbound on I-110, and the Dalrymple Dr. exit all within 1-2 miles of the Washington exit.
Posted by Grassy1
Member since Oct 2009
6253 posts
Posted on 8/15/17 at 5:30 pm to
This state makes me want to move so bad.
Posted by SPEEDY
2005 Tiger Smack Poster of the Year
Member since Dec 2003
83360 posts
Posted on 8/15/17 at 7:25 pm to
Double post
This post was edited on 8/15/17 at 7:26 pm
first pageprev pagePage 1 of 2Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram