More problems at new MSY Terminal - broken pipes

Posted on 7/31/19 at 11:32 am
Posted by LSUFanHouston
NOLA
Member since Jul 2009
37174 posts
Posted on 7/31/19 at 11:32 am
LINK

quote:

more problems arose for New Orleans’ new billion-dollar airport after a contractor recently discovered multiple breaks in the sanitary drain line that runs underneath the terminal.


quote:

the representative said there are 15,000 linear feet of drain line under the terminal, and as a result of the recent breaks, the contractor will have to replace about 300 of those feet.


2% of the line isn't huge... but how are these problems continuing to happen?

I know it's fun to blame Mitch... but Mitch didn't personally design the terminal or construct it. There are some serious issues with the design and construction quality.

So many construction and design issues. Are our local companies not able to handle a project this large? Are they unable to handle design-build projects?
Posted by themasterpater
I travel
Member since Sep 2014
1342 posts
Posted on 7/31/19 at 11:33 am to
It’s Nawlins, that shite is par for the course
Posted by Fun Bunch
New Orleans
Member since May 2008
116328 posts
Posted on 7/31/19 at 11:34 am to
There's a poster on here who has been all over this.

Pretty much said its a disaster and is already sinking, the contractors and everyone fricked up, bad.

Honestly I think we desperately need a new airport and am looking forward to it, but goddamn this city and state can't do anything right.
Posted by upgrayedd
Lifting at Tobin's house
Member since Mar 2013
134959 posts
Posted on 7/31/19 at 11:34 am to
Wasn't this the excuse for the last delay? They're not even getting creative in their lying anymore.
Posted by TigerWise
Front Seat of an Uber
Member since Sep 2010
35113 posts
Posted on 7/31/19 at 11:36 am to
This is what happens when you award contracts based off of relationships and skin tones instead of capabilities
Posted by Walking the Earth
Member since Feb 2013
17260 posts
Posted on 7/31/19 at 11:36 am to
On the bright side, with all of these delays, all the access roads might actually be built in time for the 2035 grand opening.

They might want to get ahead of the curve and build a couple of extra gates for the SpaceX and Blue Origin spaceships for the moon tourists while they have the spare time.
Posted by Mr. Hangover
New Orleans
Member since Sep 2003
34521 posts
Posted on 7/31/19 at 11:37 am to
BREAKING: new construction has a few hangups as panic grips the public










Honestly, they probably had a preconstruction survey/study lined up to test for this type of shite, but some politician probably laundered the frick out of that money and the study was never done

This post was edited on 7/31/19 at 11:40 am
Posted by upgrayedd
Lifting at Tobin's house
Member since Mar 2013
134959 posts
Posted on 7/31/19 at 11:39 am to
quote:

BREAKING: old building needs maintenance work as panic grips the public

The building is brand new
Posted by Fun Bunch
New Orleans
Member since May 2008
116328 posts
Posted on 7/31/19 at 11:39 am to
He changed it before I could quote him
Posted by Tony The Tiger
The Woodlands, TX
Member since Sep 2003
2599 posts
Posted on 7/31/19 at 11:39 am to
quote:

So many construction and design issues.


Lowest bid + DBE requirements

This post was edited on 7/31/19 at 11:41 am
Posted by CaptainJ47
Gonzales
Member since Nov 2007
7376 posts
Posted on 7/31/19 at 11:40 am to
Hey baw I wanted to get the city to pay for my next F350 and more truck nuts so I left some shotty work to force them to pay me more. Ease up man.
Posted by arseinclarse
Algiers Purnt
Member since Apr 2007
34447 posts
Posted on 7/31/19 at 11:40 am to
quote:

This is what happens when you award contracts based off of relationships and skin tones instead of capabilities


and build right next to the swamp
Posted by LSUFanHouston
NOLA
Member since Jul 2009
37174 posts
Posted on 7/31/19 at 11:40 am to
quote:

Wasn't this the excuse for the last delay? They're not even getting creative in their lying anymore.


Oh, they said it's not connected to the OTHER problem with sewer lines, as if that's supposed to make us feel better...
Posted by Mr. Hangover
New Orleans
Member since Sep 2003
34521 posts
Posted on 7/31/19 at 11:41 am to
That’s the difference between you and a quality poster like my boy upgrayedd

This post was edited on 7/31/19 at 11:42 am
Posted by tgrbaitn08
Member since Dec 2007
146214 posts
Posted on 7/31/19 at 11:41 am to
quote:

but Mitch didn't personally design the terminal or construct it.


Then tell us who did we can blame them
Posted by LCA131
Home of the Fake Sig lines
Member since Feb 2008
72630 posts
Posted on 7/31/19 at 11:42 am to
Everyone please, just calm down.

Thanks.
Posted by tgrbaitn08
Member since Dec 2007
146214 posts
Posted on 7/31/19 at 11:43 am to
quote:

nd is already sinking,


How is that possible? Boh Bros drove piles for 2-3 years. Did they need another year or 2 to drive more?
Posted by bbrownso
Member since Mar 2008
8985 posts
Posted on 7/31/19 at 11:44 am to
quote:

I know it's fun to blame Mitch... but Mitch didn't personally design the terminal or construct it.

But Mitch certainly tried to rush it through so it could potentially be ready for the tricentennial.
Posted by bbrownso
Member since Mar 2008
8985 posts
Posted on 7/31/19 at 11:46 am to
quote:

Oh, they said it's not connected to the OTHER problem with sewer lines, as if that's supposed to make us feel better...


You mean hearing "These are totally new problems with the sewer line" isn't a comfort?
Posted by wizziko
New Jersey Nets Fan
Member since Jan 2006
35881 posts
Posted on 7/31/19 at 11:46 am to
Why didn't they just build the new terminal next to the old one?
Page 1 2 3 4 5 6 7 8
Jump to page
first pageprev pagePage 1 of 8Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram