Started By
Message

re: With the hiring of Wade, its time the PMac is replaced as well

Posted on 3/21/17 at 11:37 am to
Posted by junkfunky
Member since Jan 2011
33934 posts
Posted on 3/21/17 at 11:37 am to
quote:

To get more knee room, they would need to create deeper rows. How would that be done? Can the whole setup be demo'd and re-poured?


If the configuration works out (I'm having a hard time seeing it) you can install foam blocking (to reduce the weight) and pour new concrete over it.
This post was edited on 3/21/17 at 11:38 am
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram