Started By
Message
locked post

Will there be more detailed renderings of the South End Zone expansion...

Posted on 8/3/12 at 5:39 pm
Posted by Daigeaux
Mountains of East Tennessee
Member since Jul 2005
5967 posts
Posted on 8/3/12 at 5:39 pm
...or are the ones already released the final ones?
Posted by Tiger Nation 84
Member since Dec 2011
36531 posts
Posted on 8/3/12 at 6:15 pm to
I thought they were final :idk:
This post was edited on 8/3/12 at 6:16 pm
Posted by Jefferson Davis
Plank Road
Member since Nov 2011
5960 posts
Posted on 8/3/12 at 7:09 pm to
I would think they have to release final renderings and final numbers. All of the information released thus far says "around 60 suites" or "around 3,000 club seats," etc.


And I had no idea Tech was expanding/renovating their stadium. Good for them.
Posted by junkfunky
Member since Jan 2011
33962 posts
Posted on 8/3/12 at 7:22 pm to
Assuming the project is designed and modeled in a 3D software, LSU can request new renderings that would be very accurate once the design is completed. As for the renderings produced from Google sketchup released previously, it would be a waste of time for the architect to revise them. So, I would think that if they release more renderings it would be after the construction documents are issued.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram