Started By
Message

re: For the technical folks..

Posted on 7/14/10 at 6:49 am to
Posted by oilfieldtiger
Pittsburgh, PA
Member since Dec 2003
2904 posts
Posted on 7/14/10 at 6:49 am to
ultimately, the q4000 will be removed from the field. the final configuration would involve the drillships discoverer enterprise and discoverer clear leader, the helix producer fpso, and the toisa pisces well test vessel would all ultimately be connected to the well. the q4000 is being removed from the mix since it's the smallest of these vessels and does not have oil storage capability -- i.e. everything it is producing has to be burned in the flare.

the drillships would be connected via the capping stack, while the producer and pisces would be connected via the manifold on the seafloor.

i think they're proceeding w/ the integrity test slowly and cautiously because if it's successful, you can have the well shut in rather than trying to contain tens of thouands of barrels of oil.
Posted by ccw
Baton Rouge
Member since Jan 2006
170 posts
Posted on 7/14/10 at 7:26 am to
The careful approach makes a lot of sense; that my be why they are also considering diverting the oil into non producing oil wells nearby, particularly if the stack can't safely hold off the high oil pressure, and needed the producer ships to decompress the situation. That's more critical when there is a hurricane in the gulf...........
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram