Started By
Message

re: construction work on a majar airport.

Posted on 4/1/15 at 8:30 pm to
Posted by WHATASHAME
Louisiana
Member since Sep 2009
621 posts
Posted on 4/1/15 at 8:30 pm to
Very confusing as expected from the fed. Google: FAA AC Circular. Happy hunting!
Posted by Sandy_Ash
Member since Feb 2015
1162 posts
Posted on 4/1/15 at 8:39 pm to
Majar works at 7/11; not an airport
Posted by aaronb023
TeamBunt CEO
Member since Feb 2005
11774 posts
Posted on 4/1/15 at 9:02 pm to
I've done a couple of few at BTR too. Pain in the arse compared to normal projects.

Have to have someone at gate to check people in.

Equipment and trucks need the Orange and white flag

Vehicles need flashing light on top.

You can only have so many people working under one authorized person (forget what they call it but they have to take a test)

You have to have radios tuned to a certain frequency to listen to air traffic control

Hard to get away with shoddy work

Bastards want their runways/taxiways smooth
This post was edited on 4/1/15 at 9:05 pm
first pageprev pagePage 2 of 2Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram