Is it possible to show a range for task duration?

If yes, how?

Some tasks can take between 8 to 12 weeks depending on numerous outside variables so I don't want to lock myself down for one duration.

How do I best go about showing a range for duration?

I've used the almighty google but can't seem to find what I need.
Posted by NawlinsTigah270
Mile High
Member since Jun 2008
13115 posts
Posted on 6/3/14 at 10:23 am to
Tech Board, bro
Posted by BayouBrawl
Junk Yard
Member since Aug 2012
1151 posts
Posted on 6/3/14 at 10:46 am to
Upgrade to Primavera. Stop using an inferior product.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram