Houma Guys: How can they build the Prospect Lift Bridge any slower?


The empire state building was done in one year and 45 days, yet these bozos have made this a three year project!! THREE YEARS.






Back to top
Share on
wickowick
LSU Fan
Head of Island
Member since Dec 2006
13392 posts

re: Houma Guys: How can they build the Prospect Lift Bridge any slower?


They learned how to build roads from the guys in Baton Rouge...





Back to top
geauxpimp
LSU Fan
Cocodrie, LA
Member since Nov 2007
1528 posts

re: Houma Guys: How can they build the Prospect Lift Bridge any slower?


Impossible. They are still going way faster than any road contractor in Baton Rouge.





Back to top
Capt ST
LSU Fan
EM-50 Project
Member since Aug 2011
3795 posts

re: Houma Guys: How can they build the Prospect Lift Bridge any slower?


They brought in an out of state contractor for the bridge? That's insane to take that long, there should be some sort of LD clause in contract.





Back to top
Tounces
Clemson Fan
Baton Rouge
Member since Jul 2010
993 posts

re: Houma Guys: How can they build the Prospect Lift Bridge any slower?


That shite is aggravating as hell, I can't get daiquiris when I get to Houma anymore





Back to top
Capt ST
LSU Fan
EM-50 Project
Member since Aug 2011
3795 posts

re: Houma Guys: How can they build the Prospect Lift Bridge any slower?


You on Four Points?





Back to top
SpeckHunter
LSU Fan
Denham Springs
Member since Sep 2012
736 posts

re: Houma Guys: How can they build the Prospect Lift Bridge any slower?


Has to be getting close to being done.





Back to top
QuietTiger
LSU Fan
New Orleans
Member since Dec 2003
17277 posts

re: Houma Guys: How can they build the Prospect Lift Bridge any slower?


Looked to be close to opening the last time I was down. Really hasn't been a problem for us.





Back to top
geauxpimp
LSU Fan
Cocodrie, LA
Member since Nov 2007
1528 posts

re: Houma Guys: How can they build the Prospect Lift Bridge any slower?


It has got to be very close. They had the road stripes painted on it two weeks ago, and yesterday the red blinking lights on the bridge were blinking!





Back to top
ReefDonkey
Member since Feb 2013
138 posts

re: Houma Guys: How can they build the Prospect Lift Bridge any slower?


My dad works for James. The bridge has been done for a few months now, but they were having some mechanical problems that had to be evaluated and fixed by some guys from over seas apparently. The construction company finished their part on schedule FWIW.