- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
West Maurepas Freshwater Diversion Project (revisited)
Posted on 10/13/15 at 1:50 pm
Posted on 10/13/15 at 1:50 pm
Posted on 10/13/15 at 2:04 pm to Ignignot
Unlike lower Plaquemines that would be awesome for that area.
Posted on 10/13/15 at 3:39 pm to ihometiger
quote:
It is #3 on the list of the top 4 of the 19th most important Louisiana projects. This means it will get funding and will probably start sometime construction over the next 36 months.
I've been hearing this since 2003.
Posted on 10/13/15 at 3:48 pm to Ignignot
I have been told it is still in the design phase, estimated 1.5-2 years to start actual construction...
Posted on 10/13/15 at 4:13 pm to iron banks
quote:
Unlike lower Plaquemines that would be awesome for that area.
totally agree, you can't shrimp in Maurepas and a lil freshwater won't hurt the crabs
Posted on 10/13/15 at 5:15 pm to iron banks
quote:
Unlike lower Plaquemines that would be awesome for that area.
Plaquemines parish?
Posted on 10/13/15 at 6:08 pm to ihometiger
Is there a list of everything they have already done from the Coast 2050 plan?
Posted on 10/13/15 at 6:46 pm to Hammertime
IDK but Coast 2050 is outdated anyway. The States Master Plan, which first came out in 2007, and is updated every five years, is the guiding document.
Posted on 10/13/15 at 6:59 pm to diplip
Gotcha. I can't remember all of the plan names, but was curious as to what they have checked off of their lists
Posted on 10/13/15 at 7:04 pm to Hammertime
I will see what I can dig up for you.
Posted on 10/13/15 at 8:50 pm to Ignignot
I was at first all in on this project.
Then recently i read articles about how blind river diversion took away flow rate of amite river and is destroying the lower amite and im skeptical if it actually will work without side effects
Then recently i read articles about how blind river diversion took away flow rate of amite river and is destroying the lower amite and im skeptical if it actually will work without side effects
Posted on 10/13/15 at 10:01 pm to ToulatownTiger
quote:
Then recently i read articles about how blind river diversion took away flow rate of amite river and is destroying the lower amite and im skeptical if it actually will work without side effects
FYI..A new rock wall is being planned at the crossover on the Amite to help with the flow down the lower Amite at higher stages.
Secondly, 2000cfs will not move any sediment into the area, so it would only a freshwater diversion not a sediment diversion. The freshwater would help keep salinity levels down, but I am not sure if its really needed in that area.
Posted on 10/13/15 at 10:04 pm to ScottieP
quote:
The freshwater would help keep salinity levels down, but I am not sure if its really needed in that area.
It'll help the bass fishing ;)
Posted on 10/13/15 at 10:27 pm to ToulatownTiger
So taking flow rate away from the Miss River is going to have negative side effects on ? Or is it the introduction of Miss River into the swamp that you are skeptical of? Not trying to be a smart arse....just curious on different points of view.
Posted on 10/13/15 at 10:38 pm to Manchac Man
Super small percent of MS River. I'd think it help way more than hurt anything.
Posted on 10/13/15 at 10:50 pm to Ignignot
The project is alive. Its design report is under review. It got some BP $$ to finish off design. It will be built in next decade no doubt.
If it wasn't hard enough to optimize the design for the Goldie Locks type stuff (too much vs too little freshwater, and when), these things cross multiple pipelines, utilities, roads, railroads etc. And property rights haven't even been mentioned...
Also, it is designed such that it will have the ability to flow full (2000 cfs) for not even half the year.
If it wasn't hard enough to optimize the design for the Goldie Locks type stuff (too much vs too little freshwater, and when), these things cross multiple pipelines, utilities, roads, railroads etc. And property rights haven't even been mentioned...
Also, it is designed such that it will have the ability to flow full (2000 cfs) for not even half the year.
This post was edited on 10/13/15 at 10:53 pm
Posted on 10/13/15 at 11:08 pm to man in the stadium
quote:
The project is alive. Its design report is under review. It got some BP $$ to finish off design. It will be built in next decade no doubt.
If it wasn't hard enough to optimize the design for the Goldie Locks type stuff (too much vs too little freshwater, and when), these things cross multiple pipelines, utilities, roads, railroads etc. And property rights haven't even been mentioned...
Also, it is designed such that it will have the ability to flow full (2000 cfs) for not even half the year.
too bad simple decisions can't be made like that with the Barataria and Breton Sound diversions...hmmmm...I wonder why
Posted on 10/13/15 at 11:35 pm to gaetti15
Can someone tell me why we can't drop a bomb on the levee just south of port sulphur? There's nothing along the river but two levees south of there