Page 1
Page 1
Started By
Message

Staining and sealing new deck

Posted on 3/24/15 at 8:49 am
Posted by PurpleHaze583
New Orleans
Member since Feb 2009
212 posts
Posted on 3/24/15 at 8:49 am
I just had a new deck installed and want to stain and seal it. For pressure treated wood, how long should I wait before applying the stain? Any recommendations on the best product to use?
Posted by wickowick
Head of Island
Member since Dec 2006
45810 posts
Posted on 3/24/15 at 9:05 am to
I think it needs a couple of months to dry out before staining. I have really liked the TWP stains, and they have been highly regarded on threads in the past. Use a foam 6" finger roller with a pole attached to stain. You can apply it very quickly...
Posted by coreybdx
Lockport
Member since Jun 2011
208 posts
Posted on 3/24/15 at 9:09 am to
Not sure of the dry out time, but I used the Thompson water seal with the stain already in it, easy to apply and looks pretty good to me.
Posted by JPBiscuit
Gulf Coast
Member since Jan 2005
217 posts
Posted on 3/24/15 at 10:13 am to
You do need to let it dry out for a while. I think we let ours dry for close to 6-8 months. Stained it with WoodRx. Good stuff. Pier is now two years old and looks brand new.

From my interwebs research the thompsons was not well regarded. There is a huge thread on the Hull Truth about deck sealing.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram