Houma Guys: How can they build the Prospect Lift Bridge any slower?

The empire state building was done in one year and 45 days, yet these bozos have made this a three year project!! THREE YEARS.


wickowick
LSU Fan
Head of Island
Member since Dec 2006
27566 posts
Online

re: Houma Guys: How can they build the Prospect Lift Bridge any slower?
They learned how to build roads from the guys in Baton Rouge...


geauxpimp
LSU Fan
Cocodrie, LA
Member since Nov 2007
1665 posts

re: Houma Guys: How can they build the Prospect Lift Bridge any slower?
Impossible. They are still going way faster than any road contractor in Baton Rouge.


Capt ST
LSU Fan
Middle of the Mall
Member since Aug 2011
6819 posts

re: Houma Guys: How can they build the Prospect Lift Bridge any slower?
They brought in an out of state contractor for the bridge? That's insane to take that long, there should be some sort of LD clause in contract.


Tounces
LSU Fan
Baton Rouge
Member since Jul 2010
1413 posts
Online

re: Houma Guys: How can they build the Prospect Lift Bridge any slower?
That shite is aggravating as hell, I can't get daiquiris when I get to Houma anymore


Capt ST
LSU Fan
Middle of the Mall
Member since Aug 2011
6819 posts

re: Houma Guys: How can they build the Prospect Lift Bridge any slower?
You on Four Points?


SpeckHunter
LSU Fan
Denham Springs
Member since Sep 2012
853 posts

re: Houma Guys: How can they build the Prospect Lift Bridge any slower?
Has to be getting close to being done.


QuietTiger
LSU Fan
New Orleans
Member since Dec 2003
20788 posts

re: Houma Guys: How can they build the Prospect Lift Bridge any slower?
Looked to be close to opening the last time I was down. Really hasn't been a problem for us.


geauxpimp
LSU Fan
Cocodrie, LA
Member since Nov 2007
1665 posts

re: Houma Guys: How can they build the Prospect Lift Bridge any slower?
It has got to be very close. They had the road stripes painted on it two weeks ago, and yesterday the red blinking lights on the bridge were blinking!


Replies (0)
Replies (0)
ReefDonkey
Member since Feb 2013
138 posts

re: Houma Guys: How can they build the Prospect Lift Bridge any slower?
My dad works for James. The bridge has been done for a few months now, but they were having some mechanical problems that had to be evaluated and fixed by some guys from over seas apparently. The construction company finished their part on schedule FWIW.


Replies (0)
Replies (0)