- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
Posted on 11/2/23 at 1:07 pm to GeorgeReymond
Repairing the road leading to and exiting the airport would go a long way. Not the airports road and JP probably doesn't have much motivation to fix it.
Posted on 11/2/23 at 1:29 pm to fightin tigers
The airport is supposed to be getting $8mil to fix said road from the FAA. Key words: supposed to be
Posted on 11/2/23 at 1:39 pm to The Goat
The goat path the rental shuttle takes is the only thing I don’t like about MSY.
It is unfathomable how they designed such a long route for such a short distance.
It is unfathomable how they designed such a long route for such a short distance.
Posted on 11/2/23 at 1:41 pm to The Goat
quote:consider it part of being properly cultured
Can someone please explain the overly circuitous route the shuttles take from rental to terminal. I can make no sense of this. I could drive to Laplace in the time it takes.
Popular
Back to top
![logo](https://images.tigerdroppings.com/images/layout/TDIcon.jpg)