- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
North Louisiana getting a new bridge and it’s gonna be about 350
Posted on 4/11/23 at 11:38 am
Posted on 4/11/23 at 11:38 am
LINK
quote:
After a review of submitted bids for a new Jimmie Davis Bridge, the Louisiana Department of Transportation and Development awarded the contract to James Construction Group, LLC, with a price bid of $361,743,367 and a proposed time to completion of about five years.
quote:
Construction is anticipated to begin in early 2024, with an estimated completion in late 2028, weather permitting. The design-builder will construct a new four-lane bridge north of the current structure.
Once complete, the Jimmie Davis Bridge will be rehabilitated into a linear park that will connect the existing bicycle and pedestrian trails across the Red River. At that point, DOTD said the repurposed bridge will be transferred to Louisiana State Parks within the Office of Culture, Recreation, and Tourism.
Additionally, LA 511 (Jimmie Davis Highway) will be reconstructed from the east end of the Jimmie Davis Bridge to U.S. 71 (Barksdale Boulevard) into a four-lane, median-divided highway, providing a full-access interchange between LA 511 and Arthur Ray Teague Parkway.
Posted on 4/11/23 at 11:40 am to Water
Cars will be driving across that bridge before they've finished the studies on the new Mississippi RIver bridge in Baton Rouge.
Posted on 4/11/23 at 11:40 am to Water
Meanwhile, the part of Louisiana that's growing (south Louisiana), has collapsing freeway bridges and a desperate need for a new river crossing.
Posted on 4/11/23 at 11:41 am to Water
quote:
Once complete, the Jimmie Davis Bridge will be rehabilitated into a linear park that will connect the existing bicycle and pedestrian trails across the Red River. At that point, DOTD said the repurposed bridge will be transferred to Louisiana State Parks within the Office of Culture, Recreation, and Tourism.
hell yeah
about time
Posted on 4/11/23 at 11:41 am to Water
Way past time. Rust holding hands.
Posted on 4/11/23 at 11:42 am to Water
Shreveport’s network of roads and highways has always surpassed BR’s.
Posted on 4/11/23 at 11:43 am to Water
quote:
Additionally, LA 511 (Jimmie Davis Highway) will be reconstructed from the east end of the Jimmie Davis Bridge to U.S. 71 (Barksdale Boulevard) into a four-lane, median-divided highway, providing a full-access interchange between LA 511 and Arthur Ray Teague Parkway.
frick Shreveport, though.
I thought I heard it was going to be a toll bridge to help pay for it.
Posted on 4/11/23 at 11:44 am to Clyde Tipton
quote:
I thought I heard it was going to be a toll bridge to help pay for it.
the toll bridge is proposed to the south, closer to the port
Posted on 4/11/23 at 11:44 am to dewster
quote:
Meanwhile, the part of Louisiana that's growing (south Louisiana), has collapsing freeway bridges and a desperate
Is the I-10 bridge in Lake Charles still standing? I think that they’re going to wait for it to literally collapse before they replace it.
Posted on 4/11/23 at 11:49 am to High C
quote:
Is the I-10 bridge in Lake Charles still standing? I think that they’re going to wait for it to literally collapse before they replace it.
It's crumbling. But it's there.
Posted on 4/11/23 at 11:49 am to Water
quote:
price bid of $361,743,367
Is the last 3 or 4 numbers just random? Do we really believe the estimating is that accurate? Is it a bidding strategy?
$361,750,000
Posted on 4/11/23 at 11:52 am to Water
It’ll never be ready in time
Posted on 4/11/23 at 11:52 am to Water
Is Foster Campbell going drive on it before it’s ready?
Posted on 4/11/23 at 11:54 am to LSUtigerME
We use random numbers in estimating, yes.
Posted on 4/11/23 at 12:05 pm to lachellie
I remember when that bridge was new and the Gateway to Hot Wheels Skating Rink.
Posted on 4/11/23 at 12:19 pm to lachellie
quote:looks like the la-182 bridge in berwick/morgan city
Posted on 4/11/23 at 12:23 pm to Water
No need to build a raised bridge there to accommodate river traffic. It’d be cheaper to build a drawbridge for the rare boat requiring clearance.
Posted on 4/11/23 at 12:36 pm to Water
Monroe is finally getting it's Kansas Lane extension too
Posted on 4/11/23 at 12:39 pm to Flanders
quote:
We use random numbers in estimating, yes.
They use the same machine that draws the numbers for the lottery.
Posted on 4/11/23 at 12:47 pm to DavidTheGnome
quote:didn’t know about this. Where are they extending it?
Monroe is finally getting it's Kansas Lane extension too
Popular
Back to top
Follow TigerDroppings for LSU Football News