re: Morganza Spillway may or may not open for a 3rd time -- lack of clear info from ACoE

Posted on 6/6/19 at 2:18 pm to
Posted by lsuKountRy
Member since Oct 2018
18 posts
Posted on 6/6/19 at 2:18 pm to
If you haven't yet, you need to watch yesterday's video on FB from the NOLA Corps Col. Michael Clancy (District Commander) addressing some common questions....relationship between flow and stage height, upstream effect (none) of spillway opening and his take on dredging. The last 6 months of dredging at the mouth of the MS River resulted in that dredged area filling up in 11 minutes.

LINK to FB video
This post was edited on 6/6/19 at 2:20 pm
Posted by BallsEleven
Member since Mar 2019
6163 posts
Posted on 6/6/19 at 2:23 pm to
The same area filled up in 11 mins after that stopped dredging?
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram