Page 1
Page 1
Started By
Message

re: Morganza Spillway may or may not open for a 3rd time -- lack of clear info from ACoE

Posted on 6/4/19 at 1:21 pm to
Posted by lsuKountRy
Member since Oct 2018
20 posts
Posted on 6/4/19 at 1:21 pm to
I heard two interesting thoughts yesterday regarding the opening/delay of the opening (yes,trustworthy sources):

1. The delay can be at least partially attributed to our litigious society. If the trigger numbers (on paper) are not actually met by the river, and the Corp opens the gates and the land floods, an attorney will have a field day. (regardless of the flooded land being in a designated FLOODway)

2. the Corp will begin opening the gates if triggers are NOT met only when there is a threat to overtop the actual gates (bt gates and roadway). Should the water overtop the gates this is considered "uncontrolled" and that defeats the purpose of a "Control" structure.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram