re: Nicholson Green Light Project

Posted on 6/1/16 at 9:18 am to
Posted by Breric
Member since Oct 2007
519 posts
Posted on 6/1/16 at 9:18 am to
Pretty sure it takes an act of congress to obtain ROW from a railroad, assuming they would have to in this case.
Posted by LNCHBOX
70448
Member since Jun 2009
84464 posts
Posted on 6/1/16 at 9:30 am to
quote:

Pretty sure it takes an act of congress to obtain ROW from a railroad, assuming they would have to in this case.


Try getting them to actually show up to a meeting, or if they do, to send people that have authority to do anything other than take notes.
Posted by Roscoe
Member since Sep 2007
2918 posts
Posted on 6/1/16 at 9:37 am to
Looks like they aren't even in the design phase:

LINK /

This article says construction to start in 2019:

LINK

As far as the Lee/Brightside/Nicholson light, looks like this project just will never get going:

According to this article, construction was projected to start in October 2013:

LINK

According to this article, the design phase and advertisement for construction was anticipated to take place by spring/summer of 2015:

LINK
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram