Started By
Message

re: Miss River Flood Thread 2016, river back on the rise again.......

Posted on 12/31/15 at 12:34 pm to
Posted by SurfOrYak
BR/MsDelta
Member since Jul 2015
405 posts
Posted on 12/31/15 at 12:34 pm to
Just to be clear, the cuts you are referring to are in the river bank itself at the Duncan Point area, and are not directly affecting the levee. And to be even clearer, the levee at Duncan Point was fortified in 2012 with an extensive $2 million project. The river bank cuts you reference were discovered this summer.
Posted by Voorhies7
Rounding 3rd
Member since Oct 2012
5591 posts
Posted on 12/31/15 at 12:37 pm to
2 million in dirt work ain't shite. Thats like building 4 oil field drilling pads. 2 in some places.

Comstock built one pad that cost more than that in the Tuscaloosa
This post was edited on 12/31/15 at 12:39 pm
Posted by Voorhies7
Rounding 3rd
Member since Oct 2012
5591 posts
Posted on 12/31/15 at 12:48 pm to



This is how you fix a slough off. This is some of my personal work in the Tuscaloosa. This road doesn't hold the importance as our levee system either. When something has to be done right the budget does equate into the project.
This post was edited on 12/31/15 at 12:49 pm
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram