Started By
Message

re: BR with the oh so convenient construction on brightside 2 days before classes

Posted on 1/12/15 at 3:31 pm to
Posted by SundayFunday
Member since Sep 2011
9311 posts
Posted on 1/12/15 at 3:31 pm to
I still don't know why they are doing this. The roads were fine and now it just looks like shite with patches of new concrete scattered around while traffic on Lee is at an all time high due to the clusterfrick that is the construction.


Looks like they are fixing the patches with drains and nothing else.
Posted by OneMoreTime
Florida Gulf Coast Fan
Member since Dec 2008
61837 posts
Posted on 1/12/15 at 3:33 pm to
it has nothing to do with the condition of the roads. It's for the sewer system.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram