Started By
Message

re: Audiophile/Vinyl Thread - Post Pics, Advice, Questions, Setups, etc.

Posted on 8/20/17 at 11:48 am to
Posted by Marco Esquandolas
Member since Jul 2013
11428 posts
Posted on 8/20/17 at 11:48 am to
Walls have been taped and floated and the primer coat of paint is up (3 coats total). There will be 10" crown moulding to offset the wall/ceiling colors as well as trim on the ceiling (to add depth).

The bottom 3' of the walls will have a whitish colored wainscoting around the entire room--that begins this week as well as cabinet installation.

It looks a little dark now, but the windows are blocked and there is only the can lights on now--more rail lighting will be installed--and the 3' of wainscoting will lighten it up a bit.



This post was edited on 8/20/17 at 4:09 pm
Posted by davidlsu
Member since Jan 2008
2958 posts
Posted on 8/20/17 at 2:02 pm to
Man that's gonna look awesome I can't wait to see the finished product
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram