Started By
Message

re: Bike path in BR

Posted on 7/5/14 at 11:29 am to
Posted by tigers win2
Baton Rouge
Member since Oct 2009
3839 posts
Posted on 7/5/14 at 11:29 am to
It's partially done. Runs along MOLA and and goes towards Lowe's on Seigen. It runs along the side of the canal between interstate and MOLA

Also, they are currently doing the prep work to extend levee path to Lauberge.
This post was edited on 7/5/14 at 11:30 am
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram