Started By
Message

re: Photo Gallery: Construction Update: Tiger Stadium South Endzone 4/22/2014

Posted on 4/23/14 at 10:45 am to
Posted by TigersOfGeauxld
Just across the water...
Member since Aug 2009
25057 posts
Posted on 4/23/14 at 10:45 am to
quote:

What's this area at the very top?


Elevator well, stairs, restrooms...concessions are being constructed next to it.
Posted by spslayto
Member since Feb 2004
19728 posts
Posted on 4/23/14 at 10:50 am to
quote:

Elevator well, stairs, restrooms...concessions are being constructed next to it.


And isn't that where standing room only section will be. Looks like there's plenty room up there to put additional temporary bleachers for huge games if LSU wanted to.
Posted by Phil A Sheo
equinsu ocha
Member since Aug 2011
12166 posts
Posted on 4/23/14 at 10:55 am to
quote:

Elevator well, stairs, restrooms...concessions are being constructed next to it.


well besides the obvious..


quote:

And isn't that where standing room only section will be


Figured that's what it was
This post was edited on 4/23/14 at 10:56 am
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram