Started By
Message

re: How many of you have measured and formed your own house pad?

Posted on 4/9/14 at 9:13 pm to
Posted by slapahoe
USA
Member since Sep 2009
7446 posts
Posted on 4/9/14 at 9:13 pm to
quote:

Piss on that. There are Hispanics everywhere waiting to dig footings, form a slab, place concrete, finish concrete, wreck forms, and clean up after they're done.


Im talking just dirt work. Im def no where near handy enough to handle a slab of this magnitude.
Posted by 4LSU2
Member since Dec 2009
37346 posts
Posted on 4/9/14 at 9:16 pm to
quote:

Im talking just dirt work. Im def no where near handy enough to handle a slab of this magnitude.


Odds are you will need a compacted subgrade, which will include cutting your existing soil to a depth and importing structural fill to a new subgrade elevation. This is all dependent on your existing soil condition, of course.

It sounds to me like you need to let the pros handle the slab and you contact NASCAR for tips on digging a pond on your place.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram