Started By
Message

re: Construction on Starring Lane: STARRRING LANE IS FINISHED!!!!!

Posted on 2/10/14 at 4:53 pm to
Posted by LSUDAN1
Member since Oct 2010
9037 posts
Posted on 2/10/14 at 4:53 pm to
quote:

What pisses me off the most is after all these delays/construction the frick tards designed the ONeal/S Harrells Ferry intersection with only one through lane going west on Harrells Ferry so I still have to wait 2 light cycles at times. Piss poor design.


You are wrong on this. The plans actually call for two through lanes from the east side of the O'Neal section to line up with the two through lanes on the west side. It was actually constructed this way at first. It was supposed to be one left, two through lanes and one right turn lane. You need to ask Boe or previous councilman why they begged DPW Engineers to have this changed to what is out there today (two lefts, one through and one right). Engineers had it correct in the plans and politicians needs to stay the hell out of the way.
This post was edited on 2/10/14 at 4:55 pm
Posted by zeto
BR
Member since Oct 2006
1218 posts
Posted on 2/10/14 at 8:36 pm to
quote:

You are wrong on this. The plans actually call for two through lanes from the east side of the O'Neal section to line up with the two through lanes on the west side. It was actually constructed this way at first. It was supposed to be one left, two through lanes and one right turn lane. You need to ask Boe or previous councilman why they begged DPW Engineers to have this changed to what is out there today (two lefts, one through and one right). Engineers had it correct in the plans and politicians needs to stay the hell out of the way.


I was bitching about this the other day. Sucks that they didn't go with the original plan.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram