Started By
Message

re: North Endzone refurb

Posted on 11/29/12 at 3:17 pm to
Posted by Tigerfan7218
Baton Rouge
Member since Nov 2010
14251 posts
Posted on 11/29/12 at 3:17 pm to
Like I said, construction barricades are up, and they have already started some preliminary stuff.
Posted by bbap
Baton Rouge, LA
Member since Feb 2006
96037 posts
Posted on 11/29/12 at 3:18 pm to
10-4 i wasnt sure if your response was sarcastic in nature or not. appreciate the answer.
Posted by Tony The Tiger
The Woodlands, TX
Member since Sep 2003
2598 posts
Posted on 11/29/12 at 3:19 pm to
So much confusion in this thread :

South Endzone (Airplane side) - New Upper Deck starts now.
North Endzone (PMAC Side) - New plaza/gates/entrance (like west side) starts now.

first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram