Started By
Message

re: Why did it take TAF so long to get the architecture right?

Posted on 7/26/12 at 10:02 pm to
Posted by lsufball19
Franklin, TN
Member since Sep 2008
65074 posts
Posted on 7/26/12 at 10:02 pm to
quote:

It is doable, although Tennessee had an easier task as they simply just built a new facade around the erector set. LSU would need to strip down the west upper and create a new facade.


fwiw, tennessee also redid the entire exterior of the pressbox.

it went from

to


it was a little more than just putting brick on top to cover everything up. it was a pretty extensive project that took half a year to complete
Posted by Jefferson Davis
Plank Road
Member since Nov 2011
5960 posts
Posted on 7/26/12 at 10:57 pm to
quote:

lsufball19


They did a fantastic job with Neyland. I would love to see LSU do something of a similar nature to the west upper deck. My point was that the type of work needed at Tiger Stadium would not be exactly the same as what was done in Knoxville.
Posted by 1BIGTigerFan
100,000 posts
Member since Jan 2007
49271 posts
Posted on 7/27/12 at 1:42 am to
quote:

tennessee also redid the entire exterior of the pressbox.

I liked it better before they turned it into a movie theatre...
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram