Started By
Message

re: Why did it take TAF so long to get the architecture right?

Posted on 7/26/12 at 4:53 pm to
Posted by lsufball19
Franklin, TN
Member since Sep 2008
65079 posts
Posted on 7/26/12 at 4:53 pm to
quote:

I hope the go back to the drawing board redo the facade on the West Side. It seems very doable, and would look extremely better than the bullshite that is there now.

it's certainly doable. Tennessee redid the entire outside of Neyland stadium to alleviate the erector set look.
Posted by LSUCanFAN
In the past
Member since Jan 2009
28072 posts
Posted on 7/26/12 at 5:26 pm to
oh thank God, inB4 :it'llneverbereadyintime:
Posted by Jefferson Davis
Plank Road
Member since Nov 2011
5960 posts
Posted on 7/26/12 at 5:27 pm to
It is doable, although Tennessee had an easier task as they simply just built a new facade around the erector set. LSU would need to strip down the west upper and create a new facade.

Hell I'd be happy if they just redid the windows.
Posted by lsuirish
Member since Mar 2004
146 posts
Posted on 7/31/12 at 12:56 pm to
I was at Neyland last week and the inside was nice and upgraded in the last 10 years but the outside, where I came in (one of the endzones) still looked old and ragged. Windows just like our old dorm rooms still there. Not impressed.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram