- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: Why did it take TAF so long to get the architecture right?
Posted on 7/26/12 at 4:53 pm to absolute692
Posted on 7/26/12 at 4:53 pm to absolute692
quote:
I hope the go back to the drawing board redo the facade on the West Side. It seems very doable, and would look extremely better than the bullshite that is there now.
it's certainly doable. Tennessee redid the entire outside of Neyland stadium to alleviate the erector set look.
Posted on 7/26/12 at 5:26 pm to lsufball19
oh thank God, inB4 :it'llneverbereadyintime:
Posted on 7/26/12 at 5:27 pm to lsufball19
It is doable, although Tennessee had an easier task as they simply just built a new facade around the erector set. LSU would need to strip down the west upper and create a new facade.
Hell I'd be happy if they just redid the windows.
Hell I'd be happy if they just redid the windows.
Posted on 7/31/12 at 12:56 pm to lsufball19
I was at Neyland last week and the inside was nice and upgraded in the last 10 years but the outside, where I came in (one of the endzones) still looked old and ragged. Windows just like our old dorm rooms still there. Not impressed.
Popular
Back to top
Follow TigerDroppings for LSU Football News