Started By
Message

re: more barges loose - another one hit the old bridge

Posted on 5/21/11 at 2:45 am to
Posted by tigeraddict
Baton Rouge
Member since Mar 2007
11832 posts
Posted on 5/21/11 at 2:45 am to
quote:

what the hell kind of inspection lasts for 4 minutes?


Bubba: Whatcha think bout dat?
Leroy: looks good from my house.
Bubba: u wanna get sumtin eat?
Leroy: aight

Posted by jophst
Baton Rouge
Member since Oct 2008
722 posts
Posted on 5/21/11 at 9:11 am to
Guys ... the bridge was hit FAR before it was reported to the news. The bridge was being inspected by our bridge maintenance crews before the roadway was closed. They don't need to inspect the entire bridge .. only the impacted and potentially affected areas of the bridge. This does not take that long, but takes far longer than 4 minutes my friends. I assure you it was a thorough job as always. All parishes have crews on call 24 hours a day for quick responses to these types of issues.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram