Started By
Message

re: Relief Well at 17,810, Made it another 100 ft July 10th

Posted on 7/6/10 at 4:08 pm to
Posted by Walt OReilly
Poplarville, MS
Member since Oct 2005
124694 posts
Posted on 7/6/10 at 4:08 pm to
Dont we all
Posted by Oyster
North Shore
Member since Feb 2009
10224 posts
Posted on 7/6/10 at 4:43 pm to
quote:

The drillpipe would have been above the bottom cement plug as they circulated out mud and displaced w seawater.



Which brings up another question. Anyone have any idea at what depth the final cement plug is?

Then again if the well is flowing around the casing and thru a failedcasing hanger the casing may not even need to be perforated.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram