Started By
Message

re: New LSU Arena? - EBR Metro Council Agenda

Posted on 2/26/24 at 6:29 pm to
Posted by GeorgeReymond
Buckhead
Member since Jan 2013
10187 posts
Posted on 2/26/24 at 6:29 pm to
quote:

Exactly, prime location. Tear it down and build a modern representation of the Cow Palace, with Pete out front.

Not going to happen. It’s been said on here over and over.

LSU has plans in place to renovate the coliseum and its surrounding livestock facilities. LINK

quote:

This project consists of renovations and abatement to the John M. Parker Agricultural Center Coliseum and the adjoining Livestock Show Barn. This project is part of a larger, comprehensive, phased renovation to upgrade and enhance the usability of the Coliseum Facilities as additional funding becomes available. Phase 1 scope of work for the Coliseum will be abatement of hazardous materials in the entire building. The Coliseum is a 133,839 square feet facility built in 1937. Phase 1 for the Livestock Show Barn work will consist of abatement of hazardous materials, building code and ADA upgrades, renovations to all areas to accommodate the sheep and swine programs, adding a new roof over an arena and stock pens on the north side, and upgrades to lighting, public address system, HVAC systems, and the sprinkler system. The Livestock Show Barn is a 102,312 square feet facility built in 1939 and will be reconfigured to accommodate the Sheep and Swine Show Program.
This post was edited on 2/26/24 at 6:31 pm
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram