Started By
Message

re: GM delays start of EV production at Michigan plant due to lack of demand

Posted on 10/21/23 at 9:22 am to
Posted by Puffoluffagus
Savannah, GA
Member since Feb 2009
6123 posts
Posted on 10/21/23 at 9:22 am to
quote:

And how long will it take to get even 70% of that back


The answer is always going to be it depends and varies from ev to ev. This has to do with size of battery in the vehicle, charging station output abilities, and ev vehicle charging input abilities.

The Denali ev has a 200kw battery and can accept up to a 350kwh charge. So realistically to go from 10-80% charge in the best charging conditions would take about 30mins. However with the charging infrastructure currently that would be unlikely to be consistent results. But that doesn't mean this can't be achievable in the future.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram