Started By
Message

re: Load bearing wall removal

Posted on 11/10/22 at 2:34 am to
Posted by BRgetthenet
Member since Oct 2011
117764 posts
Posted on 11/10/22 at 2:34 am to
quote:

Not that difficult of a project. Probably come in with a double 14 or 16” Lvl. Support joist and tear out wall. It’s pretty easy. You could probably knock it out on a weekday after work by yourself.



Dude,

You totally told him to get after it. I don’t think he’s loadbearing wall removal material.
Posted by DownshiftAndFloorIt
Here
Member since Jan 2011
66763 posts
Posted on 11/10/22 at 6:30 am to
quote:

. I don’t think he’s loadbearing wall removal material.


shite man, I've seen chip gains do it plenty times.

Get some jacks, some crip boards, a few dudes, and one commercial break. Bam. Done.
Posted by Art Vandelay
LOUISIANA
Member since Sep 2005
10722 posts
Posted on 11/10/22 at 9:56 am to
quote:

Dude, You totally told him to get after it. I don’t think he’s loadbearing wall removal material.


I guess I did say it.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram