Started By
Message

re: How many of you baws went to the public meeting last night about the new bridge?

Posted on 4/26/22 at 10:29 am to
Posted by dewster
Chicago
Member since Aug 2006
25441 posts
Posted on 4/26/22 at 10:29 am to
quote:

This will literally be fixed within 5-10 years.


The I-10 widening in Baton Rouge is going to absolutely suck during construction, but the finished result should be awesome.

The preliminary layouts that I saw posted on LADOTD's website look very good. This is actually a well thought out design. Hopefully they don't cock it up during construction.
This post was edited on 4/26/22 at 10:30 am
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram