Started By
Message

re: How many of you baws went to the public meeting last night about the new bridge?

Posted on 4/26/22 at 10:24 am to
Posted by dewster
Chicago
Member since Aug 2006
25445 posts
Posted on 4/26/22 at 10:24 am to
quote:

Judy Eits said she is bothered that the bridge may be constructed too far south, to get traffic to New Orleans. Eits said lots of traffic on the current bridge near Port Allen, especially 18-wheelers, is trying to get to I-12 on the way east and those drivers want to avoid New Orleans. "I don't know that is our big problem," she said, meaning making it easier for motorists to get to eastbound I-10.


Oh FFS the media picks this idiot to quote?

There is not a single location that's possible that won't upset somebody. But they have to get moving on this whole endeavor and make a selection if they want a prayer in ever getting this funded and built. And they need to do it quickly.

My advice would be to pick the location that will attract the most vehicular traffic and use tolls to pay for as much of it as possible.
Posted by tigerinthebueche
Member since Oct 2010
36791 posts
Posted on 4/26/22 at 10:43 am to
quote:

Oh FFS the media picks this idiot to quote?

Is she wrong? If the majority of the traffic is trying to get to I12, she has a point. No sense in building a bridge no one wants to take.

But I emphatically agree they need to start doing something. At some point the MRB, like the bridge in Lake Chuck is gonna have to be replaced. Nothing lasts forever! So I’d think they’d want to get started on an alternative crossing somewhere.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram