Started By
Message

re: I-10 widening in BR will be 24/7 project for 4 years instead of 8

Posted on 2/24/22 at 8:12 am to
Posted by dewster
Chicago
Member since Aug 2006
25395 posts
Posted on 2/24/22 at 8:12 am to
quote:

15 years instead of 30



FIFY.

It's a huge undertaking to widen an elevated freeway through a populated urban area with very limited space that requires at least some expropriation of poorly maintained (but potentially historic) homes in minority neighborhoods. It will probably be the the last project of its kind in Louisiana. It's probably going to eventually be easier politically just to knock down neighborhoods in the suburbs and build a loop.
This post was edited on 2/24/22 at 8:18 am
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram