- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
University Lakes construction expecting delays after no contractors bid on project
Posted on 10/1/24 at 11:00 am
Posted on 10/1/24 at 11:00 am
LINK
I can see why that may cause a delay.
BATON ROUGE - A portion of the University Lakes Project has hit an unexpected snag after it didn't receive any bids from contractors for the May Street bridge portion of the plan.
Project manager Mark Goodson says they received a "variety of reasons why contractors ultimately decided not to submit a bid," but did not elaborate in an email with WBRZ.
Goodson says over 30 contractors downloaded the bid package when it was advertised.
While the news isn't what the project was hoping for, Goodson says it will delay construction but hopefully not for long.
I can see why that may cause a delay.
BATON ROUGE - A portion of the University Lakes Project has hit an unexpected snag after it didn't receive any bids from contractors for the May Street bridge portion of the plan.
Project manager Mark Goodson says they received a "variety of reasons why contractors ultimately decided not to submit a bid," but did not elaborate in an email with WBRZ.
Goodson says over 30 contractors downloaded the bid package when it was advertised.
While the news isn't what the project was hoping for, Goodson says it will delay construction but hopefully not for long.
This post was edited on 10/1/24 at 11:02 am
Posted on 10/1/24 at 11:01 am to secfballfan
Should be completed by 2035.
Posted on 10/1/24 at 11:02 am to secfballfan
Not even the slimiest want to touch it. Yikes.
Posted on 10/1/24 at 11:02 am to secfballfan
Of course it’s gonna take longer. And probably over budget too.
Posted on 10/1/24 at 11:03 am to secfballfan
quote:
variety of reasons why contractors ultimately decided not to submit a bid,
BECAUSE OF ALL THE STIPULATIONS YOU PUT ON THE PROJECT
i bet this is going to be the Project from Hell for any poor sucker who takes it on.
Posted on 10/1/24 at 11:07 am to secfballfan
The lakes project has turned into an absolute disaster. Have y’all seen the size of the bird sanctuary? It looks like it has quadrupled in size. At the rate they’re going, there won’t be much of a lake left.
Posted on 10/1/24 at 11:10 am to secfballfan
It may very well never be ready in time
Posted on 10/1/24 at 11:13 am to sec13rowBBseat28
quote:
The lakes project has turned into an absolute disaster. Have y’all seen the size of the bird sanctuary? It looks like it has quadrupled in size. At the rate they’re going, there won’t be much of a lake left
Come on man. The birds need a place to land.
Let the pedestrians, cyclists, and joggers run in the street.
Posted on 10/1/24 at 11:14 am to secfballfan
Looks like shite I pass by everyday. Should of kept it as is
Posted on 10/1/24 at 11:19 am to sec13rowBBseat28
quote:This is just the beginning. They plan to pile more dredge material to extend the banks and then add marsh grass 20-30 feet into the water in many places. It’s all in the plan published on the website but the illustrations minimize these aspects.
At the rate they’re going, there won’t be much of a lake left.
This post was edited on 10/1/24 at 11:21 am
Posted on 10/1/24 at 11:22 am to SlackMaster
Yep. People are going to be outraged when they realize what’s being done.
Posted on 10/1/24 at 11:23 am to secfballfan
I would take on the project at a cost +35% fee
Posted on 10/1/24 at 11:28 am to 225Tyga
this thing has disaster written all over it and my guess is it ends up in the same condition it was in before they started the project
Posted on 10/1/24 at 11:29 am to sec13rowBBseat28
quote:I think so too — especially when they see what an unmanageable mess the marsh grass becomes.
People are going to be outraged when they realize what’s being done.
Posted on 10/1/24 at 11:36 am to secfballfan
No bids at all? Hell, I’d think some contractors would at least throw a FU number out there
Posted on 10/1/24 at 11:40 am to TigersSEC2010
quote:
Not even the slimiest want to touch it. Yikes.
When allegedly 30 contractors downloaded the bid package and NONE of them enter a bid it is a YOU problem...not them.
On a side note, how many other moderately sized cities can f-up digging a hole?
Posted on 10/1/24 at 11:41 am to secfballfan
I run about 3-4 times a week. The Lakes are a shite show right now. Let's hope they get it done soon. I jump over about 20 dead turtles every time I'm out there.
Posted on 10/1/24 at 11:56 am to Alt26
quote:
When allegedly 30 contractors downloaded the bid package and NONE of them enter a bid it is a YOU problem...not them
CSRS and Stantec, the designers and program managers, have been over their heads from the beginning. The number of unintelligent things done from their goofy little circle island over by Brian Kelly's house that has already sank to the screwball contractors from up north who have no idea what they are doing trying to dredge and remove debris...but it all comes back to how you design and write the specs. They wrote the plans and specs that allowed these goofs the room to win and fail to construct at any reasonable pace or for any reasonable budget, they wrote the plans and specs this time around where, like others have said, nobody even wanted to throw out an FU number. Any one looking to do in-the-wet construction in LA should pay attention to the failures present here, but hey, Stantec is also under fire for all the corrosion at the New Orleans outfall pumps in Lakeview and Gentilly and it hasnt seemed to have dissuaded others from hiring them over and over.
This post was edited on 10/1/24 at 12:10 pm
Posted on 10/1/24 at 12:04 pm to secfballfan
Bureaucrats for you. Mucking everything up.
Posted on 10/1/24 at 12:14 pm to secfballfan
I'll build that fricker 1800s style out of 12x12 posts and 2x12s. Ya'll will by kayaking under it in 6 months.