- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
PMAC renovations in the works, architects hired, no timeline as of yet
Posted on 5/16/17 at 8:00 am
Posted on 5/16/17 at 8:00 am
Saw this all over twitter last night, surprised it hasn't made it here yet.
LINK
Also, Alleva announced plans to put in a food court when the dorms in the south EZ in TS are removed.
Nutrition center happening
LINK
quote:
Soon, the PMAC could have more than just a new video board.
Imagine club level seating, possibly even suites and an expansive entrance lobby.
Those are long-term plans for LSU’s 45-year old basketball arena, school officials revealed Monday during the Tiger Athletic Foundation’s Tiger Tour in Baton Rouge. Architects have already been at work on possible plans for the arena, said Eddie Nunez, LSU’s deputy director of athletics in charge of projects.
The two areas of emphasis are the entrance to the building, currently two ramps up to the second floor, and premium seating, which is nonexistent at the PMAC.
“We’ve already had some conceptual plans drawn up to see kind of how we make it better,” Nunez said. “We had some architects do some preliminary work. It is something we really need to do for that venue.”
The arena is getting a new four-sided video board, suspended over midcourt, this summer. The HD-quality board is scheduled for installation in July, Nunez said.
There are plenty of other changes coming in the future.
Athletic director Joe Alleva told the crowd on Monday that he’d like to raze the two ramps, replacing them, potentially, with escalators and constructing a “nice lobby in the front of the building.”
On the inside, officials are hoping to remove seating, possibly decreasing the 13,215 capacity, in order to add club or suite levels, Alleva and Nunez said.
“It has to be modernized,” Alleva said of the PMAC. “I’d like to build a club level at the PMAC. Just like in football and baseball we have club areas. We need a club area in the PMAC. Those will be plans we’re laying out here in the near future I hope.”
The location of the club level is uncertain, Nunez said. The most illogical would be on the floor level because that would remove too many seats, he said. The ideal location is on the second or third (top) tier of the arena.
“The good part about it is our second level really isn’t a second level traditionally. It’s not far up,” Nunez said. “If you take that area ... Is that the best? Or is it the third level? Those are things (architects) are going to try to figure out.”
Also, Alleva announced plans to put in a food court when the dorms in the south EZ in TS are removed.
Nutrition center happening
quote:
The nutrition center will be attached to the football operations building, athletic director Joe Alleva said Monday at a Tiger Athletic Foundation Tiger Tour event in Baton Rouge. The news is no surprise, as officials said two weeks ago they were “aggressively” exploring the possibility of having the nutrition center included in the scheduled expansion to the football operations building.
The nutrition center, an athlete-only, glorified dining hall, would be one of several additions to the operations facility during a facelift of the 12-year-old building.
After the 2017 season, crews will begin renovating several aspects of the center, including coaches’ offices, the players’ lounge, locker room and training rooms. Coaches will have to work from temporary offices in trailers for several months, Alleva said. The renovations, including the addition of the nutrition center, are expected to last through the 2018 season, he said.
This post was edited on 5/16/17 at 8:18 am
Posted on 5/16/17 at 8:06 am to sicboy
Didn't this happen not to long ago.
Posted on 5/16/17 at 8:06 am to DeafVallyBatnR
What? Them talking about it? This was being tweeted from some LSU event last night.
Posted on 5/16/17 at 8:08 am to sicboy
quote:
Athletic director Joe Alleva told the crowd on Monday that he’d like to raze the two ramps, replacing them, potentially, with escalators and constructing a “nice lobby in the front of the building.”
Great.....escalators that are always broken like in Tiger Stadium.
Posted on 5/16/17 at 8:08 am to sicboy
I wish we would tear it down and build a better facility
Posted on 5/16/17 at 8:08 am to sicboy
Always wanna be like big brother from Lafayette
Posted on 5/16/17 at 8:08 am to sicboy
TYPICAL....give me MORE money and screw the rank and file fan.
Posted on 5/16/17 at 8:12 am to sicboy
The powers that be want to make more money.
They can sell suites to the fat cats and whether they come or not doesn't matter. It's more money to the bottom line.
But first things first, let's start winning some games, get the students more involved, get the media out of the bleachers and get the buzz back.
They can sell suites to the fat cats and whether they come or not doesn't matter. It's more money to the bottom line.
But first things first, let's start winning some games, get the students more involved, get the media out of the bleachers and get the buzz back.
Posted on 5/16/17 at 8:16 am to tickfawtiger
quote:
TYPICAL....give me MORE money and screw the rank and file fan.
Didn't see too many of you rank and filers in the PMAC last also
Also, sorry you are a poor.
Posted on 5/16/17 at 8:18 am to sicboy
Plans for the nutrition center announced, link now in OP.
Posted on 5/16/17 at 8:18 am to CajunsTigersSaints
quote:
Always wanna be like big brother from Lafayette
City renovated the Cajundome.
Private money will renovate PMAC.
Big difference. LSU not sucking off taxpayer titty.
Posted on 5/16/17 at 8:23 am to sicboy
quote:
The nutrition center
Plans were drawn up, bids were taken and this project was ready to go to construction, but King killed it, even though it was TAF funded and not university/state. He didnt like the optics when they were in a budget crunch
Posted on 5/16/17 at 8:27 am to tigeraddict
I'd like to see those drawings.
Posted on 5/16/17 at 8:30 am to sicboy
Move the seats closer to the court
Move the seats closer to the court
etc.
Move the seats closer to the court
etc.
Posted on 5/16/17 at 8:40 am to geauxtigahs87
I just hope I don't lose my season tickets. I love my seats.
Posted on 5/16/17 at 8:43 am to sicboy
I am disappoint in rant....
IT'LL NEVER BE READY IN TIME
IT'LL NEVER BE READY IN TIME
Posted on 5/16/17 at 8:44 am to sicboy
Can't remove the ramps, or else where would the students camp out overnight before big games?
Posted on 5/16/17 at 8:47 am to sicboy
quote:it will never be ready in time...
no timeline as of yet
Posted on 5/16/17 at 8:48 am to LMfan
Tear it down and rebuild near Alex box
This post was edited on 5/16/17 at 8:49 am
Back to top
Follow TigerDroppings for LSU Football News