Fair price for patio work

Posted on 3/25/20 at 9:40 pm
Posted by AFtigerFan
Ohio
Member since Feb 2008
3245 posts
Posted on 3/25/20 at 9:40 pm
I'm in the process of building a house, and I got a quote from the builder on additional concrete work in the backyard. Concrete will already be under the deck, so anything in red in the image will be extra. I was quoted roughly $2,000. I'm just wondering if this is a fair price.

Posted by Coon
La 56 Southbound
Member since Feb 2005
18492 posts
Posted on 3/25/20 at 9:47 pm to
If that’s material and labor, I’d say yes.

Posted by AFtigerFan
Ohio
Member since Feb 2008
3245 posts
Posted on 3/25/20 at 9:48 pm to
quote:

If that’s material and labor, I’d say yes.

It would be for everything. As long as it's fair, I'm good with it.
Posted by eng08
Member since Jan 2013
5997 posts
Posted on 3/25/20 at 9:58 pm to
That’s a steal
Posted by Coon
La 56 Southbound
Member since Feb 2005
18492 posts
Posted on 3/25/20 at 9:59 pm to
Is the house slab and other concrete poured already and complete and you’re just tacking this on?

I come up with about 205sf which is about $9.75/sf. That’s really high BUT you have to remember they’re having to pour just this so not that far fetched.

2.5cy so you probably order 3 at $110/cy plus a short load fee of say $100. So you’re at $430 there.

Probably forming material is $100.

How will they get the concrete back there? Can they back a truck up? If not, Georgia buggy plus fuel probably $200. So we’re at $730 before labor.

So you’re at $1270 for labor. What’s a contractor charge rate for labor? If he pays his guys $10-$15 he has taxes and that fun stiff so he’s probably into it for $20/hr.

3 8h days for 2 guys is 48h x $20 = $960

So he makes $300.

Again, not that crazy.
Posted by AFtigerFan
Ohio
Member since Feb 2008
3245 posts
Posted on 3/25/20 at 10:25 pm to
quote:

Is the house slab and other concrete poured already and complete and you’re just tacking this on?

House is almost complete, but no concrete work has been done yet (meaning driveway, patio under the deck, sidewalk, etc.). The area in red would be done at the same time as the patio under the deck is poured.

quote:

How will they get the concrete back there? Can they back a truck up?
They should be able to get a truck back there, but this would be done at the same time as the patio, which is already included in the house price.
quote:

So he makes $300.

I wouldn't be upset at this. The idea is to have a happy medium where the builder can get his profit and I feel like I got a decent enough price on the extra concrete.
This post was edited on 3/25/20 at 10:36 pm
Posted by Coon
La 56 Southbound
Member since Feb 2005
18492 posts
Posted on 3/25/20 at 10:37 pm to
Pi r^2
3.14159265x7x7
Approx 153sf

ETA: nice edit, hahaha

If your flat work isn’t don’t yet, $2000 is way too high. Labor for flat work shouldn’t be more than $1.50-$2/sf.
This post was edited on 3/25/20 at 10:39 pm
Posted by AFtigerFan
Ohio
Member since Feb 2008
3245 posts
Posted on 3/25/20 at 10:43 pm to
quote:

ETA: nice edit, hahaha

Yep, I used radius instead of diameter. I was a little quick on the trigger. I believe you're right and $2,000 is too much. I'll try to negotiate a better cost, but I need to be aware of what it would cost to have someone come after the fact and do it. I appreciate the help.
Posted by MoarKilometers
Member since Apr 2015
17870 posts
Posted on 3/26/20 at 8:15 am to
So is everything already formed up and you're now trying to add on after everything was prepped for a certain size? If yes, 2000 is quite reasonable for the change order.
Posted by AFtigerFan
Ohio
Member since Feb 2008
3245 posts
Posted on 3/26/20 at 8:25 am to
quote:

So is everything already formed up and you're now trying to add on after everything was prepped for a certain size? If yes, 2000 is quite reasonable for the change order.

Nothing is formed up as of yet. This is in the planning stage and they'd like me to finalize the plan prior to them beginning any of the flat work.
This post was edited on 3/26/20 at 8:26 am
Posted by MoarKilometers
Member since Apr 2015
17870 posts
Posted on 3/26/20 at 8:33 am to
quote:

Nothing is formed up as of yet. This is in the planning stage and they'd like me to finalize the plan prior to them beginning any of the flat work.

Fair enough then, I'd counter with 1500 then... you'll probably end up meeting in the middle. Forming a circle is a pain in the arse, but still less than 2k worth of hassle.

You definitely don't want to do the small addons after the fact though. The sidewalk to circle maybe, but the 1 or 2 foot extension sections would have to be drilled and rebar added to keep them from separating/sinking.
This post was edited on 3/26/20 at 8:37 am
Posted by Coon
La 56 Southbound
Member since Feb 2005
18492 posts
Posted on 3/26/20 at 10:34 am to
Even if everything is formed up, that’s expensive.
Posted by Cracker
in a box
Member since Nov 2009
17664 posts
Posted on 3/26/20 at 11:18 am to
Yes
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram